Composite bonding preparation for Helicopter Rotor Blades. Client: Boeing

Inline 7-axis system for etching long aero structures. This is an 80’ (eighty foot) long wet blast system with robotic and trolley manipulation. This system wet blasts the helicopter blade and spar as they move through the blast, closed loop rinse, and drying zones. Boeing CH47 Chinook.